Planning prévisionnel
Week 1 (October 21-25)
Day 1 : Monday
- Understanding the subject
- Highlighting the problems
- Setting up the overall organization and assigning roles
Days 2 : Tuesday
- Yilin and Raul: Deconvolution and filtering in Matlab
- Xiaolin and Shutian: Phase mask in Matlab
- Romain and Yanis: Optical system design in Zemax
- Gabriel: Communication, project tracking, assistance on Matlab and Zemax
Day 3 Wednesday :
Morning :
Brainstorm about the model of scene and the model of noise to choose
Afternoon :
Working on the optical system (Gabriel, Romain, Yanis)
Working on the signal processing : optimization of the parameters of the phase mask (exponential phase mask) (Raul, Shutian, Xiaolin, Yilin).
Day 4 Thursday :
Morning :
Working on the presentation
Afternoon :
Working on the optical
system (Gabriel, Romain, Yanis). Objective : to have an optical system
that is diffraction limited, with an image field of 6.14mm and the
smaller F number feasible for one wavelength.
Working on the signal processing : optimization of the parameters of the phase mask (Raul,
Shutian, Xiaolin, Yilin). Objective : Have a set of parameters that
optimize the exponential phase mask, work on the noise simulation
Send a first version of the presentation to Alice and Marie-Anne
Day 5 Friday :
Morning :
Presentation training + feedback
Extra-time to work on the project (OS and filter)
Afternoon :
Presentation
First morning :
Summary of all the things we have done and discussion about the planning of the week
Zemax :
- Test several optical systems (at least 2 : one with the phase mask in front of the optics, the other with the phase mask inside the optics)
- Correct the chromatic aberrations of the systems
- Tolerancement : is the system robust ?
Zemax and phase mask :
- Use a phase mask on Zemax
- Code a phase mask in C and implement it Zemax, communication between C and Zemax
Matlab :
- Optimization of the parameters for the phase mask
- Continue to work on the image processing
- Try to reproduce the graphics of the normalized MTF as in the article (https://www.mdpi.com/2076-3417/12/11/5290) for different phase masks
- Create our own phase mask adapted to our needs
~1/2 days : Finishing + improving what we have done during the first week (for instance for the OS, use more wavelength + simulate a defect on the wavefront (not a Airy disk)).
See if the filter can be use for many situations.
~2/3 days : Tolerance for the OS and the filter
At the end of the week, we need to have a final optical system to start working on SolidWorks during the 3rd week.
<< We will try to fulfill these goals during this week, completing the following the points in order >>
Decide who will work on Solidworks + formation Solidworks
Week 3 (April 28 - May 2)
Solidworks work
Think about and make the poster for IngenIOGS
If we are to far from our original goal, better take the part that are still incomplete rather than begin new things